Project description

The 2-chamber pharmaceutical isolator project, completed in June 2026, confirms the highest engineering competencies of GMM Inox. This advanced process equipment has been fully tailored to the rigorous requirements of the pharmaceutical industry, combining precision craftsmanship with specialized technological expertise.

Category

Pharmaceutical isolators

Labor input

1395 man-hours

Delivery time

25.06.2026 r.

Technical requirements

Precise execution according to individual specification (Ra 0.5 / Ra 0.8)

Project objectives

The main challenge of this venture was to design and manufacture a device ensuring complete process separation, while maintaining the highest hygiene and occupational safety standards. The project required not only absolute precision in material selection, but also the application of advanced stainless steel processing techniques, ensuring that every surface of the device meets the restrictive cleanliness standards required in laboratories and pharmaceutical manufacturing plants.

The execution was particularly demanding due to a very tight delivery schedule imposed by the client. Thanks to the excellent organization of the entire team, we managed to combine uncompromising attention to every technical detail with meeting strict deadlines. This project perfectly illustrates our approach: we fulfill orders according to individual customer specifications, taking care of every stage – from design and planning to final implementation at the recipient’s plant.

Technical specification

Details:

  • Device type: 2-chamber pharmaceutical isolator with high tightness.
  • Material of construction: Stainless steel grade AISI 316L (resistant to corrosion and sterilization processes).
  • Roughness of internal surfaces (process zone): Ra 0.5 µm (electropolished surface).
  • Roughness of external surfaces: Ra 0.8 µm (satin finish).
  • Connection technology: Full penetration welds, passivated, with high microbiological purity.
  • Labor input: 1395 man-hours (engineering, production, quality control)
  • Tightness: Tested against requirements for isolator systems (in accordance with GMP standards).
  • Compliance: Device designed in accordance with GMP (Good Manufacturing Practice) requirements.
  • Completion date: Project completed on June 25, 2026.